Analysis Factor Cost Overrun in Terms of Budget Allocation in Management Project: Case Study of PT. Thirtiez Pilar Indonesia

Ramadhan, Kaesar Agusta and Sinaga, Junaidi and Pasasa, Linus (2016) Analysis Factor Cost Overrun in Terms of Budget Allocation in Management Project: Case Study of PT. Thirtiez Pilar Indonesia. Bachelor thesis, Swiss German University.

[img]
Preview
Text
Kaesar Ramadhan 13112086 TOC.pdf

Download (1MB) | Preview
[img] Text
Kaesar Ramadhan 13112086 1.pdf
Restricted to Registered users only

Download (824kB)
[img] Text
Kaesar Ramadhan 13112086 2.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
Kaesar Ramadhan 13112086 3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
Kaesar Ramadhan 13112086 4.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
Kaesar Ramadhan 13112086 5.pdf
Restricted to Registered users only

Download (687kB)
[img]
Preview
Text
Kaesar Ramadhan 13112086 Ref.pdf

Download (327kB) | Preview

Abstract

The purpose of this study is to analyze what factor that causes of cost overrun in every project for Thirtiez group. This research is using quantitative and using both primary and secondary data, the data collected by interview with director of some group from Thirtiez and get the data needed from company. The data which collected modified onto questionnaires which spread about 50 respondents by using PHStat within the Thirtiez group employees and director. Then the data analyzed by SPSS To test the validity and reliability also the data need to be pre-test first to test the validity of respondent answer and after can spread others questionnaires to post-test. Then through AMOS to simplify the numerical calculation, to see correlation between variables. The result shows that resource play the important role affecting cost overrun. By analyzing which of variables that influence the most cost overrun so that in the near future it can be maintained and improved, and the variable which has last impact will become the recommendation for PT. Thirtiez Pilar Indonesia.

Item Type: Thesis (Bachelor)
Uncontrolled Keywords: Cost Overrun; Delay; Resource; Financial Delay; Sub-contractor Delay; Labor Related Delay; Poor Communication; Poor Coordination; Technical Persona Shortage.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD39.5 Industrial procurement--Cost effectiveness
H Social Sciences > HD Industries. Land use. Labor > HD69 Project management
H Social Sciences > HF Commerce > HF5001 Business
H Social Sciences > HG Finance > HG4001-4285 Finance management. Business finance.
Divisions: Faculty of Business Administration and Communication > Department of Business Administration
Depositing User: Atroridho Rizky
Date Deposited: 03 Nov 2020 12:57
Last Modified: 03 Nov 2020 12:57
URI: http://repository.sgu.ac.id/id/eprint/1345

Actions (login required)

View Item View Item