Improvement Put Away Process with Class-Based and Dedicated-Based Storage in Spare Part Warehouse PT. Tire Indonesia

Firmansyah, Ali and Pratama, Aditya T. and Sofianti, Tanika D. (2021) Improvement Put Away Process with Class-Based and Dedicated-Based Storage in Spare Part Warehouse PT. Tire Indonesia. Masters thesis, Swiss German University.

[img]
Preview
Text
Ali Firmansyah TOC.pdf

Download (1MB) | Preview
[img] Text
Ali Firmansyah 1.pdf
Restricted to Registered users only

Download (693kB)
[img] Text
Ali Firmansyah 2.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
Ali Firmansyah 3.pdf
Restricted to Registered users only

Download (454kB)
[img] Text
Ali Firmansyah 4.pdf
Restricted to Registered users only

Download (3MB)
[img] Text
Ali Firmansyah 5.pdf
Restricted to Registered users only

Download (192kB)
[img]
Preview
Text
Ali Firmansyah Ref.pdf

Download (303kB) | Preview

Abstract

The 4899 items routine spare part vital that stock in spare parts warehouse which consist of 3778 items in 1st floor, 1060 in 2nd floor, 61 items non-location. Non-location and un-located spare part into rack in vital item, it caused by poor put away process. It impacts to the pick-up order process caused takes time to search and pick-up the spare part, and possible causes of missing spare parts, and also it is already become finding of internal audit PT. Tire Indonesia. This research is to identify and analyse of put away process, then improve of it used class-based and dedicated storage. Adopted the haphazard storage, put away process to allocated the item just considering empty rack; it caused poor put away process, and impact to pick-up order process that take time to search and non-location spare part occurred. The improvement with Class-based and dedicated storage by provided information where to allocate the spare part and proposed the alternative layout. It increasing the pick-up order throughput by 25 % from M009002M - 5V2043 to 5L2020 in 1st floor, and by 56 % from M230073M - 2V3051 to 5L2020 in 2nd floor spare part warehouse.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Parts, Put-Away, Pick-Up, Class-Based, Dedicated-Based
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
T Technology > TJ Mechanical engineering and machinery
T Technology > TJ Mechanical engineering and machinery > TJ163.12 Mechatronics
Divisions: Faculty of Engineering and Information Technology > Department of Mechatronics Engineering
Depositing User: Faisal Ifzaldi
Date Deposited: 19 Aug 2021 10:52
Last Modified: 19 Aug 2021 10:52
URI: http://repository.sgu.ac.id/id/eprint/2150

Actions (login required)

View Item View Item