Iswahyudi, Annas and Mashudi, Mulya R. and Ipung, Heru Purnomo (2019) IT Project Evaluation for Optimizing Enterprise Architecture Using Multi Criteria Decision Support Methods (MCDM). Masters thesis, Swiss German University.
|
Text
Annas Iswahyudi 21751011 TOC.pdf Download (1MB) | Preview |
|
Text
Annas Iswahyudi 21751011 1.pdf Restricted to Registered users only Download (678kB) |
||
Text
Annas Iswahyudi 21751011 2.pdf Restricted to Registered users only Download (192kB) |
||
Text
Annas Iswahyudi 21751011 3.pdf Restricted to Registered users only Download (1MB) |
||
Text
Annas Iswahyudi 21751011 4.pdf Restricted to Registered users only Download (254kB) |
||
Text
Annas Iswahyudi 21751011 5.pdf Restricted to Registered users only Download (439kB) |
||
|
Text
Annas Iswahyudi 21751011 Ref.pdf Download (343kB) | Preview |
Abstract
Since 2012, Indonesia Deposit Insurance Corporation (IDIC) already has had IT Blueprint. After 5 years implementations, in 2017 replaced by the new document named Enterprise Architecture. The lesson learned from previous IT Blueprint after implementation is there are many project or milestone were failed to be done with execution rate only 83% from total of initiated programs (Group Sistem Informasi of IDIC, 2017). The major factor is when IT Project are proposed with any consideration there is no certain parameter why this project being prioritized and also when evaluation managed used strategic assessment parameters according to the organization's strategic plan. Often assessments in IT project proposal only use two technical parameters, namely business benefits and ease of execution. Meanwhile when the project is approved by top level management, the assessment factors other than technical are often more likely to use obedience approaches between IT projects and institutional strategic plans and programs. The study will be gained benefits for optimizing enterprise architecture (EA) project by analyzing which the program is most important for organization to execute by develop new method of evaluating IT project through aligning with vision and mission of organization that always dynamic and changing. Balanced Score Card (BSC) for gathering the candidate of criteria’s from IT Stakeholders. Hybrid technique proposed by combining between Fuzzy AHP (Analytical Hierarchy Process) and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) to determine of decision making by sort of all criteria’s proposed from the most important to less. Fuzzy AHP is used to make an examination of prospective criteria used in compiling a priority list of projects. Whereas Fuzzy TOPSIS is used to determine the ideal solution and ranking from alternative decisions on IT projects to be evaluated.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | IT Blueprint ; Enterprise Architecture (EA) ; Balanced Scorecard (BSC) ; Fuzzy AHP ; Fuzzy TOPSIS |
Subjects: | T Technology > T Technology (General) > T58.6 Management information systems |
Divisions: | Faculty of Engineering and Information Technology > Department of Information Technology |
Depositing User: | Adityatama Ratangga |
Date Deposited: | 19 May 2020 04:07 |
Last Modified: | 19 May 2020 04:07 |
URI: | http://repository.sgu.ac.id/id/eprint/492 |
Actions (login required)
View Item |