Bakhtiar, Deni and Mashudi, Mulya R. and Galinium, Maulahikmah (2019) Determining Critical Factors Project Delay and Effecting Cost Overruns in Telecommunication Mobile Network Projects. Masters thesis, Swiss German University.
|
Text
Deni Bakhtiar 21751018 TOC.pdf Download (1MB) | Preview |
|
Text
Deni Bakhtiar 21751018 1.pdf Restricted to Registered users only Download (1MB) |
||
Text
Deni Bakhtiar 21751018 2.pdf Restricted to Registered users only Download (229kB) |
||
Text
Deni Bakhtiar 21751018 3.pdf Restricted to Registered users only Download (996kB) |
||
Text
Deni Bakhtiar 21751018 4.pdf Restricted to Registered users only Download (1MB) |
||
Text
Deni Bakhtiar 21751018 5.pdf Restricted to Registered users only Download (402kB) |
||
|
Text
Deni Bakhtiar 21751018 Ref.pdf Download (298kB) | Preview |
Abstract
A Telecommunication Mobile Network Project is common and significantly effects by enormous ways, particularly towards cost overruns. This study investigates critical factors project delay and expound its effect to cost overruns in Telecommunications Mobile Network Project in Jabodetabek area, Indonesia. Using questionnaire with 38 factors based on purpose sampling from different Contractors Organizations. The methodologies used in this study are Factor Analysis and Multiple Linear Regression that processed using IBM SPSS Statistics Software. The result of this study are three new critical factors; Lack of cost plan or monitoring (
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Critical Factors ; Project Delay ; Telecommunication Mobile Network Projects ; Factor Analysis ; Cost Overruns |
Subjects: | T Technology > T Technology (General) > T58.6 Management information systems |
Divisions: | Faculty of Engineering and Information Technology > Department of Information Technology |
Depositing User: | Adityatama Ratangga |
Date Deposited: | 19 May 2020 04:14 |
Last Modified: | 19 May 2020 04:14 |
URI: | http://repository.sgu.ac.id/id/eprint/494 |
Actions (login required)
View Item |