Ramadhan, Mohammad Rayhan and Saraswati, Triarti and Sofianti, Tanika D. (2019) Optimisation of Machine Cleaning and Setup Time in PT. Soho Industri Pharmasi. Bachelor thesis, Swiss German University.
|
Text
Mohammad Ramadhan 11407024 TOC.pdf Download (1MB) | Preview |
|
Text
Mohammad Ramadhan 11407024 1.pdf Restricted to Registered users only Download (418kB) |
||
Text
Mohammad Ramadhan 11407024 2.pdf Restricted to Registered users only Download (1MB) |
||
Text
Mohammad Ramadhan 11407024 3.pdf Restricted to Registered users only Download (312kB) |
||
Text
Mohammad Ramadhan 11407024 4.pdf Restricted to Registered users only Download (732kB) |
||
Text
Mohammad Ramadhan 11407024 5.pdf Restricted to Registered users only Download (450kB) |
||
|
Text
Mohammad Ramadhan 11407024 Ref.pdf Download (330kB) | Preview |
Abstract
PT. Soho Industri Pharamasi is a pharmaceutical company producing medicines and vitamins. Amongst all the product range, Fitkom vitamin is one of the products that has the highest and most consistent demand. Weekly production for this product goes up to a maximum of 18 batches weekly, with 240,000 tablets in each batch. When production exceeds 14 batches, an overtime on Saturdays and Sundays is necessary to achieve the weekly target. This is because during every production, a machine cleaning and setup procedure is necessary after every 6 batches of production. A machine cleaning and setup procedure means that the machine will remain idle for a total time of 11 hours. The objective if this research will be to reduce the overall machine cleaning and setup time to eliminate overtime even during full weekly capacity production of 18 batches. To do this, a Single Minute Exchange of Die will be the desired methodology to reach a machine cleaning and setup time target of 3 – 4 hours. The development process included research on the company’s current condition, the collection of historical data, and the development of an improvised standardized machine cleaning and setup procedure
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | Machine Cleaning Time ; Machine Setup Time ; Overtime ; Single Minute Exchange of Die |
Subjects: | T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering |
Divisions: | Faculty of Engineering and Information Technology > Department of Industrial Engineering |
Depositing User: | Adityatama Ratangga |
Date Deposited: | 19 May 2020 13:25 |
Last Modified: | 19 May 2020 13:25 |
URI: | http://repository.sgu.ac.id/id/eprint/563 |
Actions (login required)
View Item |