Raymond, Rinaldi and Hidayat, Nila K. and Pasasa, Linus (2014) Analysis of Logistics Delivery Performance at PT Siemens Indonesia (A Case Study of Rental Tools Delivery in XYZ Power Plant Project at the Energy Service Fossil Division). Bachelor thesis, Swiss German University.
|
Text
Rinaldi Raymond 1-3109-089 TOC.pdf Download (296kB) | Preview |
|
Text
Rinaldi Raymond 1-3109-089 1.pdf Restricted to Registered users only Download (329kB) |
||
Text
Rinaldi Raymond 1-3109-089 2.pdf Restricted to Registered users only Download (877kB) |
||
Text
Rinaldi Raymond 1-3109-089 3.pdf Restricted to Registered users only Download (576kB) |
||
Text
Rinaldi Raymond 1-3109-089 4.pdf Restricted to Registered users only Download (738kB) |
||
Text
Rinaldi Raymond 1-3109-089 5.pdf Restricted to Registered users only Download (311kB) |
||
|
Text
Rinaldi Raymond 1-3109-089 Ref.pdf Download (204kB) | Preview |
Abstract
The purpose of this study is to analyze the logistics delivery performance of rental tools delivery for temporary import in XYZ Power Plant Project at the Energy Service Division PT Siemens Indonesia. This research is a mixture of quantitative and qualitative research and using both primary and secondary data, which collected from the company data including interview with the logistics manager and monitoring delivery data of XYZ Power Plant Project in the Logistics Department Energy Service Division at PT Siemens Indonesia. The data is analyzed using Structural Equation Modelling (SEM) to identify influential factors to logistics delivery performance.. Furthermore, to measure the KPI in terms of delivery reliability of logistics delivery performance levels of rental tools in XYZ power plant project in 2013 by the logistics department in the energy service fossil division. This study uses time series data from September 2013 - December 2013. Based on the results of research, it can be seen that customs clearance has positive moderate correlation to the logistics delivery performance, while number of items factor has a positive weak correlation to the logistics delivery performance. This research also found that the KPI in terms of delivery reliability of delivery performance level of rental tools in XYZ power plant project 2013 by the logistics department in the energy service division is 56.67%” which is Insufficient in logistics benchmark level. Thus, in purpose of increasing the logistics delivery performance in the XYZ Power Plant Project, the company should improve the delivery reliability. In addition the company should pay more attention to customs clearance process, since customs clearance is the most influential factor to the logistics delivery performance.
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | Logistics; Delivery Reliability; KPI; Temporary Import; On-Time Delivery |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management H Social Sciences > HF Commerce > HF5001 Business |
Divisions: | Faculty of Business Administration and Communication > Department of Business Administration |
Depositing User: | Astuti Kusumaningrum |
Date Deposited: | 30 Dec 2021 08:59 |
Last Modified: | 30 Dec 2021 08:59 |
URI: | http://repository.sgu.ac.id/id/eprint/1242 |
Actions (login required)
View Item |