Hanief, Akbar and Pratama, Yudhistira and Awibowo, Setijo (2020) Developing Project Management System for Improving Project Management at infiniti group. Bachelor thesis, Swiss German University.
|
Text
Akbar Hanief 11607008-TOC.pdf Download (2MB) | Preview |
|
Text
Akbar Hanief 11607008-1.pdf Restricted to Registered users only Download (640kB) |
||
Text
Akbar Hanief 11607008-2.pdf Restricted to Registered users only Download (2MB) |
||
Text
Akbar Hanief 11607008-3.pdf Restricted to Registered users only Download (1MB) |
||
Text
Akbar Hanief 11607008-4.pdf Restricted to Registered users only Download (8MB) |
||
Text
Akbar Hanief 11607008-5.pdf Restricted to Registered users only Download (3MB) |
||
Text
Akbar Hanief 11607008-6.pdf Restricted to Registered users only Download (455kB) |
||
|
Text
Akbar Hanief 11607008-Ref.pdf Download (348kB) | Preview |
Abstract
Lateness in the initiation and closing of the project will affect the success of the project. in addition, the unorganized process flow of the project could lead to a loss to the company. The Project Management system has become crucial nowadays for every company. The success of the project is when the project is in the timeline schedule, and closing also meets the cost prediction on the project. According to initial observation, the project was often not in track timeline even behind schedule, lateness in the initiation, executed, and uncertain process design phase in the project and control in the project caused wasting time compared to the target-date project and resulting with more cost operation. INFINITIGROUP tries to implement a proper project management system into their standard SOP to minimize the lateness and the loss of the project. The process of collecting data is through an interview with the team project and project stakeholders as well as collecting data from the previous project timeline and cost also to join in the current project to experience the actual project. This research aims to develop a project management system based on Project schedule management. The methodology that is used to develop web-based application is waterfall methodology. The methodology consists of five sequential phases to support the research that consists of analysis, design, implementation, testing, maintenance. The result of this research is that the system application has worked well and meeting all the requirements to support the company in handling the project to be more productive and efficient. This research will further as a consideration to the company on making guidelines and project management systems.
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | Project Management; Project Schedule Management; Project Management System; Web Based Application; Waterfall Methodology |
Subjects: | T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering |
Divisions: | Faculty of Engineering and Information Technology > Department of Industrial Engineering |
Depositing User: | Faisal Ifzaldi |
Date Deposited: | 02 Nov 2020 14:08 |
Last Modified: | 02 Nov 2020 14:08 |
URI: | http://repository.sgu.ac.id/id/eprint/1892 |
Actions (login required)
View Item |