Evangelista, Eunike Anastasia and Sofianti, Tanika D. and Baskoro, Gembong (2021) Analytical Hierarchy Process (AHP) for Selection of Project Management Software to Support Remote Working: A Case Study at Logistics Division of a National EPC Company in Indonesia. Masters thesis, Swiss German University.
|
Text
Eunike Anastasia Evangelista 22052001 TOC.pdf Download (1MB) | Preview |
|
Text
Eunike Anastasia Evangelista 22052001 1.pdf Restricted to Registered users only Download (421kB) |
||
Text
Eunike Anastasia Evangelista 22052001 2.pdf Restricted to Registered users only Download (2MB) |
||
Text
Eunike Anastasia Evangelista 22052001 3.pdf Restricted to Registered users only Download (339kB) |
||
Text
Eunike Anastasia Evangelista 22052001 4.pdf Restricted to Registered users only Download (1MB) |
||
Text
Eunike Anastasia Evangelista 22052001 5.pdf Restricted to Registered users only Download (329kB) |
||
|
Text
Eunike Anastasia Evangelista 22052001 Ref.pdf Download (359kB) | Preview |
Abstract
Good project management is the main pillar of a project’s success from an internal perspective. However, in 2020, the world was being hit by a sudden disruption in the form of the pandemic disease which greatly affects all aspects of social life. One of the effects of this pandemic is a large-scale social restriction, which is the limitation of a large group of people in one activity. This limitation will lead to the working from home system implementation for some companies. The implementation of this new working system will lead to the project performance and quality as well. The use of project management software can maintain or even increase the performance of the project. The objective of the thesis work is to be able to determine the criteria needed in a project management software and decide the suitable one in a logistics department. The analytical hierarchy process method was used in this research. Based on interviews and literature reviews, the criteria used are project schedule, collaboration, and task / Kanban. Microsoft Project is being on the first rank rather than other software that has a weight value on project schedule, collaboration, and task / Kanban criteria are 0.6887, 0.5870 and 0.4502.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Project, Management, Software, Working from Home, Microsoft Project, Asana, Trello |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management H Social Sciences > HD Industries. Land use. Labor > HD69 Project management T Technology > TJ Mechanical engineering and machinery T Technology > TJ Mechanical engineering and machinery > TJ163.12 Mechatronics |
Divisions: | Faculty of Engineering and Information Technology > Department of Mechatronics Engineering |
Depositing User: | Faisal Ifzaldi |
Date Deposited: | 12 Jan 2022 14:27 |
Last Modified: | 12 Jan 2022 14:27 |
URI: | http://repository.sgu.ac.id/id/eprint/2315 |
Actions (login required)
View Item |