Sutantio, Daniel Surya and Sofianti, Tanika D. and Mahendra, Adhiguna (2018) Developing Ground Handling Scheduling System: A Case Study At Gapura. Bachelor thesis, Swiss German University.
|
Text
Daniel Sutantio 11407009 TOC.pdf Download (466kB) | Preview |
|
Text
Daniel Sutantio 11407009 1.pdf Restricted to Registered users only Download (218kB) |
||
Text
Daniel Sutantio 11407009 2.pdf Restricted to Registered users only Download (533kB) |
||
Text
Daniel Sutantio 11407009 3.pdf Restricted to Registered users only Download (101kB) |
||
Text
Daniel Sutantio 11407009 4.pdf Restricted to Registered users only Download (570kB) |
||
Text
Daniel Sutantio 11407009 5.pdf Restricted to Registered users only Download (338kB) |
||
Text
Daniel Sutantio 11407009 6.pdf Restricted to Registered users only Download (93kB) |
||
|
Text
Daniel Sutantio 11407009 Ref.pdf Download (217kB) | Preview |
Abstract
Personnel scheduling plays an important role in the service industry, as it impacts directly to the cost and the quality of customer service. However, to create personnel schedule, many feasible solutions can be created. Therefore, to solve personnel scheduling problem by using constraint programming approach will provide a better solution than offline approach. The thesis addresses shift assignment problem. In service industry, the employee is assigned to work shifts with considering some constraints, based on company regulation rules and government rules. According to the labor rules, each shift has a fix duration, with overtime duration within a specified time range. This To achieve a good feasible schedule, constraint programming will be considered. There are two types of constraint, which are hard and soft constraint. The schedule cannot be created if hard constraint is violated but the soft constraint may be violated. Soft constraint can be used as an indicator to the generated result to see if the provided solution is a better solution.
Item Type: | Thesis (Bachelor) |
---|---|
Uncontrolled Keywords: | Personnel Scheduling; Constraint Satisfaction Problem; Shift Assignment; Soft Constraint; Hard Constraint |
Subjects: | N Fine Arts > NA Architecture > NA6300 Airport terminals T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering T Technology > TS Manufactures > TS157.5 Production scheduling |
Divisions: | Faculty of Engineering and Information Technology > Department of Industrial Engineering |
Depositing User: | Astuti Kusumaningrum |
Date Deposited: | 11 Jun 2020 16:17 |
Last Modified: | 11 Jun 2020 16:17 |
URI: | http://repository.sgu.ac.id/id/eprint/725 |
Actions (login required)
View Item |